| |
Next Level Systems / General Instruments Corporate Headquarters Horsham, PA |
| A 467,000 sq. ft., corporate headquarters composed of four, three-story buildings and one four-story building, constructed in two phases. The office building structures are steel frame with a combination of conventional reinforced concrete spread footing foundations and drilled piers. Exterior finishes are brick veneer and glass wall framing. The project was designed and constructed on a “fast track” basis. |
|